Lift Plan
Builder

Fill it in on your phone at the pick. Get a clean, finished lift plan you can print and sign — with the five checks that matter baked right into it.

From the field, for the field

Built on Franklin Berg's critical-lift method — 28 years heavy civil, Certified Lift Director. No account, no install. Everything you type stays in this browser — nothing is saved or sent anywhere.

— lbs
— ft
—
Enter load & chart
1Job & Load
Check #1 lives here: the gross load is load + rigging — never the load alone. The builder adds them for you and carries the total through the whole plan.
2Crane & Chart
Check #2 lives here: chart capacity must be read at the actual radius and actual configuration — not the headline capacity on the side of the crane. At 75% of chart or more, this plan flags itself as a critical lift.
3Ground & Matting
4Crew & Roles
5Weather & Limits
✓Franklin's Five Checks
Field note: This builder organizes your plan — it does not replace the crane manufacturer's load chart, your company's lift policy, or a qualified Lift Director's judgment. Always verify capacity against the chart for the exact crane and configuration on site.

Your finished plan ↓

0 of 5 checks confirmed
Superintendents Field Pack

Critical Lift Plan

Plan date——
Critical Lift — 75% or more of chart capacity

Job & Load

Project
Load
Load weight
Rigging weight
Gross load
Weight source
Center of gravity

Crane & Chart

Crane
Configuration
Boom length
Radius
Chart capacity at radius
% of chart
Pick → Set

Ground & Matting

Surface
Bearing capacity
Matting / cribbing
Outrigger pads
Setup notes

Crew, Rigging & Communication

Lift Director
Operator
Signal Person
Rigger(s)
Rigging gear
Communication

Weather & Limits

Wind limit
Forecast / measured wind
Conditions
Stop-work rule
Hazards & notes

The Five Checks — confirmed before the pick

  • Load weight verified, rigging included
  • Load chart checked at actual radius & configuration
  • Ground & matting confirmed for outrigger loads
  • One Lift Director, one signal person, everyone else clear
  • Weather & wind limits agreed before the pick
Lift Director — sign & date
Crane Operator — sign & date
Signal Person — sign & date
Superintendents Field Pack · superfieldpacks.comPlan built with the free Lift Plan Builder
Built with the free Lift Plan Builder at superfieldpacks.com. Want the full paper plan? The Critical Lift Plan template — $49: buy.stripe.com/7sY00k2lkaRi6013608IU01. Free field lessons every other Friday in The Field Letter — sign up on the store page at superfieldpacks.com.

Download saves a clean, standalone copy of the plan above — open it in any browser to print it and sign it on paper. The page itself is also print-clean: from your browser menu, only the plan prints, not the form.

Want the full paper plan?

The builder covers the math and the checks. The Critical Lift Plan template is the full six-page paper plan — rigging worksheet, ground and matting section, lift path and sign-off block — in Word and fillable PDF, delivered by email after checkout. Buy it once, use it on every job.